Glossary entry (derived from question below)
Hebrew term or phrase:
עיבוד שתית
English translation:
processing of subgrade/trimming
Added to glossary by
Gad Kohenov
Nov 23, 2014 22:25
9 yrs ago
1 viewer *
Hebrew term
עיבוד שתית
Hebrew to English
Tech/Engineering
Construction / Civil Engineering
roadworks
עיבוד השתית יהיה לעומק 20 ס"מ כמפורט בסעיף 51.04.14.01 במפרט הכללי. העיבוד יעשה ברטיבות אופטימאלית, עם סטייה מותרת של פלוס/מינוס 2% מהרטיבות האופטימאלית לכל סוג קרקע.
its NOT: processing, machining, working, treatment, cropping, cultivation
BTW ........... שתית = subgrade
its NOT: processing, machining, working, treatment, cropping, cultivation
BTW ........... שתית = subgrade
Proposed translations
(English)
3 | processing of subgrade/trimming | Gad Kohenov |
4 | plowing of the subsoil | Harold Lemel |
3 | the subgrade shall be compacted | David Greenberg |
3 | sub-base | liora (X) |
Change log
Nov 28, 2014 11:45: Gad Kohenov Created KOG entry
Proposed translations
6 hrs
Selected
processing of subgrade/trimming
http://www.in.gov/indot/files/Earthworks_Chapter_07.pdf
--------------------------------------------------
Note added at 6 hrs (2014-11-24 04:36:10 GMT)
--------------------------------------------------
SUBGRADE TREATMENT is also mentioned in the same link.
--------------------------------------------------
Note added at 6 hrs (2014-11-24 04:36:10 GMT)
--------------------------------------------------
SUBGRADE TREATMENT is also mentioned in the same link.
4 KudoZ points awarded for this answer.
18 mins
plowing of the subsoil
The word "tillage" could also be used instead of plowing. See link below:
Example sentence:
Plowing of the subsoil to a depth of 20 cm.....
9 hrs
the subgrade shall be compacted
I don't have specific knowledge of the topic, but this seems likely to be what you need. (Please see references.) Another possibility, though one that seems less likely, is "scarified."
Reference:
https://columbus.gov/WorkArea/DownloadAsset.aspx?id=63200
http://www.vdot.virginia.gov/business/resources/materials/mcs_study_guides/bu-mat-chapter3soils.pdf
14 hrs
sub-base
Road and highway pavement design, asphalt roadbase ...
www.highwaysmaintenance.com/design.htm
The thickness of material layer will have been decided from reference to one of the various ... will have been constructed on top of the required thickness of sub-base,
www.highwaysmaintenance.com/design.htm
The thickness of material layer will have been decided from reference to one of the various ... will have been constructed on top of the required thickness of sub-base,
Something went wrong...