السياق عبارة عن نتائج اختبار أجزاء من الخرسانة
length before capping (mm)
بحثت ولقيت ان من ضمن المعاني التغطية
لكن الاختبار بيتم على الجزء الخرساني المستخرج أو هكذا أعتقد..
length before capping (mm)
بحثت ولقيت ان من ضمن المعاني التغطية
لكن الاختبار بيتم على الجزء الخرساني المستخرج أو هكذا أعتقد..
Proposed translations
(Arabic)
4 +1 | التغطية | Assem AlKhallouf |
3 | سد | TargamaT team |
References
Capping | Saeed Najmi |
Proposed translations
+1
23 mins
Selected
التغطية
تغطية العينة بطبقة من الملاط أو الوسائد المطاطية والحلقات المعدنية بغرض توزيع ضغط الاختبار على جسم العينة.
Importance of Capping
Sulfur Mortar Capping
Capping of concrete cylinders and drilled concrete cores with sulfur mortar or other capping compounds prepares specimens for compressive strength testing.
Capped cylinders must cure for at least two hours prior to testing or for 16 hours if design strength is 5,000psi (35MPa) or greater.
Whether you use the sulfur mortar capping method or neoprene pads with metal retainer rings, proper end preparation guarantees that concrete test cylinder ends or cores have smooth, parallel bearing surfaces for uniform distribution of forces during testing.
https://www.globalgilson.com/blog/compressive-strength-testi...
Importance of Capping
Sulfur Mortar Capping
Capping of concrete cylinders and drilled concrete cores with sulfur mortar or other capping compounds prepares specimens for compressive strength testing.
Capped cylinders must cure for at least two hours prior to testing or for 16 hours if design strength is 5,000psi (35MPa) or greater.
Whether you use the sulfur mortar capping method or neoprene pads with metal retainer rings, proper end preparation guarantees that concrete test cylinder ends or cores have smooth, parallel bearing surfaces for uniform distribution of forces during testing.
https://www.globalgilson.com/blog/compressive-strength-testi...
4 KudoZ points awarded for this answer.
12 mins
سد
أعتقد أنه يتحدث عن سد المكان المستعمل لأن هناك قبل وبعد في المراجع
https://www.structural-engineering-courses.bece.auburn.edu/f...
https://www.structural-engineering-courses.bece.auburn.edu/f...
Reference comments
37 mins
Reference:
Capping
Cap غطاء
Capping تغطية
https://www.engineeringcivil.com/testing-concrete-cores.html
CAPPING
Unless their ends are prepared by grinding, cores should be capped with high alumina cement mortar or sulfur-sand mixture to provide parallel end surfaces normal to the axis of the core. Other materials should not be used as they have been shown to give unreliable results. Caps should be kept as thin as possible, but if the core is hand trimmed they may be up to about the maximum aggregate size at the thickest point.
Capping تغطية
https://www.engineeringcivil.com/testing-concrete-cores.html
CAPPING
Unless their ends are prepared by grinding, cores should be capped with high alumina cement mortar or sulfur-sand mixture to provide parallel end surfaces normal to the axis of the core. Other materials should not be used as they have been shown to give unreliable results. Caps should be kept as thin as possible, but if the core is hand trimmed they may be up to about the maximum aggregate size at the thickest point.